Telephone: +44 (0) 1724 720977
Email: info@stj.uk.com
Wrexham Maelor Hospital - Paint Grade Doorset With PVC Protection Items (4)
Wrexham Maelor Hospital - Paint Grade Doorset With PVC Protection Items (6)
Wrexham Maelor Hospital - Paint Grade Doorset With PVC Protection Items (5)
Wrexham Maelor Hospital - Paint Grade Doorset With PVC Protection Items (3)
Wrexham Maelor Hospital - Paint Grade Doorset With PVC Protection Items (2)
Wrexham Maelor Hospital - Paint Grade Doorset With PVC Protection Items (1)
previous arrow
next arrow

Main Corridor Fire Door upgrade works

As Principle Contractor, we were called in by BCUHB to manufacture and install replacement fire doors within the ground floor and first floor main hospital street corridors

We were able to retain the timber door and side screen framing as this was confirmed to be of ample density and sectional dimensions for the required fire rating

Side screen glazing was replaced with Pyrodur fire rated glass

Door leafs were manufactured and replaced using solid cross laminated timber cores, with a in-house paint top coat applied to avoid additional work on site, colour matched to other doors in the same area.  Yeomanshield half height face protection in similar door colour was applied to both sides of every door leaf and contrasting Yeomanshield door edge guards were fitted to both edges of every door leaf to provide protection against bed and trolley damage etc

New electro-hold open floor springs were supplied and installed to certain locations and regular floor springs were supplied and installed to locations which also received replacement detentes

Ironmongery was supplied and installed new, to include bi-lingual signage etc

STJ Projects Ltd were employed as Principle Contractor directly by the client

Contact us to talk about your next project

Good quality service. ST&J work with the main contractor not against. Skilled carpenters provided who not only produce good quality work but do so safely and quickly. Management of H&S from the office good with detailed RAMS produced in good time. Commercial management as it should be with mutual trust and the contract followed so that any variations are agreed in advance of the work and no surprises at final account.

Roger Bancroft, Chartered Construction Manager, Interserve Construction Ltd
CHAS Accredited
CITB
Constructionline
Design in Mental Health Network
IHEEM
Reset Member Company

Subscribe to our newsletter

You can unsubscribe at any time by clicking the link in the footer of our emails. For information about our privacy practices, please visit see the link in the footer.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

Providing high quality workmanship in the most effective way possible