BAE Systems Humberside Airport
Our first works with Geo. Houlton saw us constructing the acoustic flooring to first floor floor level around the perimeter of the newly built hanger. The floor consists of acoustic barrier and insulation before the floating timber flooring was laid. Once these works were completed and walls were constructed, we returned to undertake the internal joinery package.