Having worked with Interserve Integrated Services for many years, we were asked to undertake a survey and inspection of fire doors throughout the entire Chesterfield Justice Centre to highlight defects and doors that would not perform in the event of a fire.
Having completed the survey and discussions with the client, we then proceeded to offer suitable solutions and options to bring the building fully up to safety measures.
We completed certified repairs to approx. 20 doorset locations and manufactured/installed replacement doorsets to approx. 24 doorset locations.
The repairs and the replacement doorsets were manufactured in a way to match with existing doorsets within Chesterfield Justice Centre from when the building was built. This saw us working with Oak veneered locations and also painted locations but with exposed Maple vertical lippings. We also worked hard to match the new ironmongery closely to that already installed across the project.